Energy and sustainability reports that clear council and the surveyor.
Sustainability consultants for Victorian builders, developers and design teams.
Check which reports you needEvery report accepted to date

Turnaround and coverage
- 48hoursSDA, stormwater, waste plans, residential reports and 7 star ratings.
- 72hoursSection J, lighting, construction and green travel plans.
- NCC2019, 2022 and 2025Section J and residential, on the edition that applies.
- 79Victorian councilsAll of them. Reports for every council in Victoria.
Which reports does my job need?
The usual list, from each council’s planning scheme and website.
Step 2: a quote or fee proposal for this list. Name and email are enough; the drawings can come later.
Get a price for this listOr call 0470 389 168Memberships & accreditations
- Pending
Recent work
Photos: illustrative.
Every report your permit needs, in one place.
From one drawing set and one consultant.
Planning permit: The reports that go in with the planning application.
Sustainable Design Assessment (BESS)The SDA and BESS report your application needs, from one drawing set.See the service →
Stormwater (Blue Factor / WSUD)Stop the stormwater report holding up the application.See the service →
Waste Management PlansBins, bin store and kerb layout settled before council asks for more information.See the service →
Planning permit packSDA with BESS, stormwater and the waste plan from one drawing set.See the service →
Green Travel PlansSatisfy the Green Travel Plan condition and keep the permit moving.See the service →
Construction Management PlansGet the plan approved before works start, so the start date holds.See the service →Building permit: Energy compliance for the building surveyor.
Section J (commercial)Section J off the critical path: permit-ready within 72 hours.See the service →
Residential energy (Part H6)The Part H6 energy report the surveyor needs, without the wait.See the service →
7-star energy ratings (NatHERS)A 7 star NatHERS rating with stamped plans, ready for the permit.See the service →
Lighting (Part J7)Fitout lighting checked on its own, without paying for a full envelope report.See the service →Four steps, no surprises.

- 01
Send the drawings
Upload the set or email it, with any permit conditions.
- 02
Scope confirmed
Which reports the job needs and what goes into each.
- 03
Your price
Quoted from your plans, before any work starts.
- 04
Report issued
Ready for council or the building surveyor.
Reports for every council in Victoria.
All 79 Victorian councils are in our service area, metro and regional.
Coverage
- Service area: all 79 Victorian councils
- Councils where we have completed reports (32)
Darker shading: council areas with at least one completed report in our job files. Boundaries: Vicmap, CC BY 4.0.

Why builders and developers stopped chasing reports.
Real clients, word for word.
“We've used him on pretty much everything since.”
“Made a noticeable difference on that project.”
“Straightforward and reliable”
Recent projects
Sample reports
Accreditation and insurance
Tell us about the project.
A quick quote from your plans, before any work starts.
- What will it cost?
- A quick quote from your plans, before any work starts.
- Will council accept it?
- Every report is written to the council’s own policy or the NCC edition that applies.
Beyond Green Energy Assessments



