Melbourne-based, working across Victoria0470 389 168
Beyond GreenSustainability Consultants Get my quote →

Services / Building permit

Permit-ready Section J reports for your building surveyor.

For builders, developers and architects with a Class 3 to 9 building: NCC 2025, 2022 or 2019, within 72 hours.

Every report accepted by the building surveyor to date

Modern warehouse and office building

What the report looks like.

Cover page of an example Beyond Green reportInside page of an example Beyond Green reportInside page of an example Beyond Green report
An example Beyond Green report

Why Beyond Green

  • Ready for the building surveyor

    Written to the council’s own policy or the NCC edition that applies, ready to lodge.

  • Within 72 hours

    From a complete set of drawings.

  • A quick quote

    From your plans, before any work starts.

  • The NCC edition that applies

    NCC 2025, 2022 or 2019, whichever is in force for your permit.

  • National Construction Code
  • Australian Building Codes Board
  • NatHERS Home Energy Rating
  • BESS Built Environment Sustainability Scorecard
  • Blue Factor (DEECA)
  • Victoria Planning Provisions (Department of Transport and Planning)
  • Design Matters National
  • Hero NatHERS software
  • CASBE Council Alliance for a Sustainable Built Environment
  • Sustainability Victoria
  • EPA Victoria
  • Melbourne Water
  • National Construction Code
  • Australian Building Codes Board
  • NatHERS Home Energy Rating
  • BESS Built Environment Sustainability Scorecard
  • Blue Factor (DEECA)
  • Victoria Planning Provisions (Department of Transport and Planning)
  • Design Matters National
  • Hero NatHERS software
  • CASBE Council Alliance for a Sustainable Built Environment
  • Sustainability Victoria
  • EPA Victoria
  • Melbourne Water

Step 1 of 2

A fast quote, straight from your plans.

Prefer the full form? Open it here →

Client review
“No packages, no run-around, just the reports the job actually needed.”
KhodrBuilder
Client review
“Made a noticeable difference on that project.”
DanielTownhouse developer
Client review
“We've used him on pretty much everything since.”
SteveBuilder

Request a quote

Your name, email and the report you need. Add the drawings now or later.

Your details

Report type
Add details (optional)
NCC edition, if known
Which pathway does it need

Before you send the drawings

What drawings do you need?

The architectural set: plans, elevations and sections, plus the window schedule and any specifications.

A PDF is enough.

Which NCC edition do you assess to?

The edition in force when your building permit is issued: NCC 2025 in Victoria from 1 May 2026, with projects already running sometimes still on NCC 2022 or 2019.

What if the surveyor or council comes back with questions?

Send the request to us.

Questions about our report are answered from the same drawing set.

What is a Section J report?

A Section J report is an energy efficiency assessment of a commercial or non-residential building, showing it meets Section J of NCC Volume One.

It is assessed from your drawings against the climate zone of the site and the NCC edition your permit falls under, and it forms part of the building permit documentation the surveyor reviews.

Do I need a Section J report?

If your project is new work in a Class 3 to 9 building - a warehouse, factory, office, shop, hotel, childcare or aged care facility - then almost certainly yes.

Apartment buildings (Class 2) stay on NCC 2022's Section J under NCC 2025; ask about yours.

Alterations and additions need one for the new work.

Detached houses and townhouses do not; they fall under NCC Volume Two and need a residential energy report instead.

How long does a Section J report take?

Within 72 hours for commercial Section J work, and within 48 hours for residential reports, from a complete set of drawings.

The most common cause of delay is not the assessment - it is waiting on glazing data, because the facade calculator needs a U-value and SHGC for every glazed system.

How it runs

Glass office facade reflecting the sky
  1. 01

    Send the plans

    Upload the drawing set or email it. Name, email and report type; the rest is optional.

  2. 02

    Scope confirmed

    What the job needs, checked against your drawings.

  3. 03

    Quote with it

    You see the requirements and the fee before you go ahead.

  4. 04

    Final report

    Ready for the surveyor or council.

Who it’s for

  • Builders and developers of Class 3 to 9 buildings: offices, warehouses, shops, childcare, aged care
  • Architects and designers bringing a commercial set to building permit
  • Alterations and additions, assessed on the new work

Tell us about the project.

Ready when your drawings are

Name and mobile or email. We’ll ask the rest.

What will it cost?
A quick quote from your plans, before any work starts.
Will council accept it?
Every report is written to the council’s own policy or the NCC edition that applies.

Section J reports: the details

What it covers

  • Building fabric: roof, walls and floors against the NCC values
  • Glazing through the ABCB facade calculator, every glazed system on its own line
  • Artificial lighting and controls
  • Air-conditioning, ventilation and hot water
  • NCC 2025 additions such as on-site solar and EV-ready provisions where they apply

When the building surveyor asks for it

The building surveyor asks for it as part of the building permit documentation for new work in a Class 3 to 9 building.

The NCC edition is the one in force when the building permit is issued: NCC 2025 in Victoria from 1 May 2026, with projects already running sometimes still on NCC 2022 or 2019.

Official references: National Construction Code (ABCB). .

Read more