Melbourne-based, working across Victoria0470 389 168
Beyond GreenSustainability Consultants Check my reports →

Home / Insights

Insights and guides.

Plain answers on the NCC, Section J, stormwater and waste management, taken from the codes, the planning schemes and council guidance.

Every report accepted to date

Laptop, notebook and floor plans on a desk

All articles

Rainwater running into a street drain
Stormwater

What is a Blue Factor score?

It tells council how much of a site’s stormwater nitrogen load the design treats. 100% or more meets the…

Sorted waste and recycling bins
Waste

When do you need a waste management plan?

When the council asks for one with the planning application. Each council sets its own…

Site foreman reading plans at a new house
NCC 2025

What NCC 2025 changed, and what it means for your drawings.

Victoria adopted NCC 2025 on 1 May 2026 with no transition period. Three changes reach the drawings on most commercial…

Solar panels on a commercial roof
Section J

NCC 2025 Section J: what changed for commercial buildings in Victoria

NCC 2025 is the first edition where Section J reaches past the envelope and onto the roof plan and the switchboard.…

Calculator on architectural floor plans
Section J

How much does a Section J report cost?

A Section J report is priced from your drawings and quoted before any work starts. These are the things that decide the…

Roof gutter and downpipe
Stormwater

Stormwater reports in Victoria after STORM.

STORM is gone, Blue Factor has replaced it, and the townhouse stormwater standard has a new…

Glass and timber commercial facade in afternoon sun
Section J

Which buildings does Section J apply to?

Commercial and other non-residential buildings: Class 3 and Classes 5 to 9 under NCC Volume One. Houses and, under NCC…

Curved glass office facade under a blue sky
NCC 2025

NCC 2022 vs NCC 2025: what changed in energy efficiency

For commercial buildings, a lot. For houses, the headline numbers carried over. For apartments, Section J stayed on the…

Aerial view of townhouses with rooftop solar and gardens
Planning

When do you need an SDA or an SMP?

When the council's local ESD policy asks for one. The thresholds are set council by council, and Clause 55 changed what…

Apartment balconies with lush planting
Planning

What is BESS?

The Built Environment Sustainability Scorecard: a free online tool, built by Victorian councils, that shows how a…

Bright double-height modern living room
Residential

7 star NatHERS requirements in Victoria

Since 1 May 2024, a new Victorian home rated through NatHERS needs at least 7 stars and a whole-of-home rating of at…

Glass office facade with a tree and the sun
Section J

JV3 or Deemed-to-Satisfy: which Section J route?

Most projects use Deemed-to-Satisfy. The J1V3 reference building method, still called JV3 from its 2019 name, models…

Cyclist riding a city street in morning sun
Planning

When do you need a Green Travel Plan?

Usually with a Sustainability Management Plan, for larger developments. The council's ESD policy sets the size, and…

Finished modern office buildings among greenery
Construction

When do you need a construction management plan?

When the planning permit says so, or the council's local law asks for one. Each council sets its own triggers and its…

  • National Construction Code
  • Australian Building Codes Board
  • NatHERS Home Energy Rating
  • BESS Built Environment Sustainability Scorecard
  • Blue Factor (DEECA)
  • Melbourne Water
  • EPA Victoria
  • Victoria State Government, Department of Transport and Planning (Victoria Planning Provisions)
  • City of Melbourne
  • City of Casey
  • City of Ballarat

Which reports does my job need?

The usual list, from each council’s planning scheme and website.

1. What are you building?
3. What stage are you at?

Tell us about the project.

A quick quote from your plans, before any work starts.

Quick quote from your plans. Planning and residential reports within 48 hours; Section J, CMP and GTP within 72 hours.

Start here

See which reports your job needs, then get the quote for that list.

Call 0470 389 168

Request a quote

Your name, email and the report you need. Add the drawings now or later.

Your details

Report type
Add details (optional)
NCC edition, if known
Which pathway does it need
What will it cost?
A quick quote from your plans, before any work starts.
Will council accept it?
Every report is written to the council’s own policy or the NCC edition that applies.