Beyond Green Energy Assessments Beyond GreenEnergy Assessments

Fitouts and internal alterations

Lighting assessments for fitouts, without the full envelope report.

When the only trigger is new artificial lighting, the assessment is lighting alone — simpler, faster, and quoted as such.

Illumination power densityControl allowances appliedInterstate work considered

What's covered

The lighting provisions, on their own.

DENSITY

Power density by space

Every space type assessed against its allowance, using the lighting schedule and the reflected ceiling plan.

CONTROLS

Control allowances

Occupancy and daylight controls credited where the design earns them, which is often what brings a tight fitout inside the allowance.

WHEN

When this is the right report

No new or altered external glazing, no change to the envelope. If the shopfront is changing, it is a full Section J instead.

Not sure which one your job needs? Send the drawings and it is confirmed before quoting.

Space by space

The allowance is per space, not per building.

An open office, a store and a corridor are each allowed a different lighting power density. The assessment takes the lighting schedule and the reflected ceiling plan and works through the plate one space at a time, crediting the occupancy and daylight controls the design has actually earned.

OPEN OFFICEMEETINGSTOREAMENITIESRETAIL FLOORCORRIDOR

Lighting assessment

Spaces assessed0
Floor area0
Control allowances applied0
Luminaire types0

Illustrative plan. Every fitout is assessed from its own lighting schedule and ceiling plan, against the NCC edition it falls under.

Contact

Tell us about the project.

Tell us which report you need and send the drawings. A fixed quote comes straight back.

Email bgenergyassessments@gmail.com Call 0470 389 168

Taner Terlemez · Beyond Green Energy Assessments · ABN 25 918 681 385

Already have the drawings?

Send them straight through and skip a round of back-and-forth. Four questions, then the upload.

Send drawings for a quote

What does the project need?

Report type

The project

Where is it
NCC edition, if known

Compliance pathway

Which pathway does it need

You and the drawings