Melbourne-based, working across Victoria0470 389 168
Beyond GreenSustainability Consultants Get my quote →

Services / Planning permit

Council-ready Green Travel Plans.

For apartment, mixed-use and office developments with a Green Travel Plan condition: written to your council’s requirements, within 72 hours.

Written to your council’s own requirements

Tram in a Melbourne city street

What the report looks like.

Cover page of an example Beyond Green reportInside page of an example Beyond Green reportInside page of an example Beyond Green report
An example Beyond Green report

Why Beyond Green

  • Ready for council

    Written to the council’s own policy or the NCC edition that applies, ready to lodge.

  • Within 72 hours

    From a complete set of drawings.

  • A quick quote

    From your plans, before any work starts.

  • One drawing set

    Planning reports prepared together from the same plans, so you brief one consultant.

  • National Construction Code
  • Australian Building Codes Board
  • NatHERS Home Energy Rating
  • BESS Built Environment Sustainability Scorecard
  • Blue Factor (DEECA)
  • Victoria Planning Provisions (Department of Transport and Planning)
  • Design Matters National
  • Hero NatHERS software
  • CASBE Council Alliance for a Sustainable Built Environment
  • Sustainability Victoria
  • EPA Victoria
  • Melbourne Water
  • National Construction Code
  • Australian Building Codes Board
  • NatHERS Home Energy Rating
  • BESS Built Environment Sustainability Scorecard
  • Blue Factor (DEECA)
  • Victoria Planning Provisions (Department of Transport and Planning)
  • Design Matters National
  • Hero NatHERS software
  • CASBE Council Alliance for a Sustainable Built Environment
  • Sustainability Victoria
  • EPA Victoria
  • Melbourne Water

Step 1 of 2

A fast quote, straight from your plans.

Prefer the full form? Open it here →

Client review
“Made a noticeable difference on that project.”
DanielTownhouse developer
Client review
“No packages, no run-around, just the reports the job actually needed.”
KhodrBuilder
Client review
“We've used him on pretty much everything since.”
SteveBuilder

Request a quote

Your name, email and the report you need. Add the drawings now or later.

Your details

Report type
Add details (optional)
NCC edition, if known
Which pathway does it need

Before you send the drawings

What drawings do you need?

The drawings, the dwelling numbers or floor areas, the car and bike parking provided, and the permit condition or council request if you have one.

Is it written to my council’s requirements?

Yes.

Each report follows the council’s own policy, planning scheme clauses and template where it has one.

What if council asks for further information?

Send the request to us.

Questions about our report are answered from the same drawing set.

Is a Green Travel Plan required for every development?

No.

There is no statewide rule.

It depends on your council's planning scheme, any overlay on the site, and the conditions on your permit.

Send the permit condition or the council's request and the scope is confirmed before the fee proposal.

Is it lodged with the application or after the permit?

Both happen.

Some councils want it with the application and then ask for an amended version by condition.

Others make it a condition to be approved before development starts.

Once approved it is endorsed and forms part of the permit.

What bike parking does Clause 52.34 ask for?

For dwellings in developments of four or more storeys, 1 resident space to each 5 dwellings and 1 visitor space to each 10.

For offices over 1,000 m2 of net floor area, 1 employee space to each 300 m2 and 1 visitor space to each 1,000 m2.

Once 5 or more employee spaces are required, showers and change rooms follow.

A permit can vary these numbers.

How it runs

Bicycles parked in a city street
  1. 01

    Send the drawings

    With the permit condition or council request, if you have one.

  2. 02

    Your price

    Scope, fee and timing, before any work starts.

  3. 03

    You accept, we start

    Written to your council’s own requirements.

  4. 04

    Plan issued

    Ready to lodge with council or satisfy the condition.

Who it’s for

  • Apartment, mixed-use and office developments where the council asks for one
  • Projects with a Green Travel Plan permit condition to satisfy before development starts
  • Applications where a reduced car parking rate is being sought

Tell us about the project.

Ready when your drawings are

Name and mobile or email. We’ll ask the rest.

What will it cost?
A quick quote from your plans, before any work starts.
Will council accept it?
Every report is written to the council’s own policy or the NCC edition that applies.

Green Travel Plans: the details

What it covers

  • The site in its transport context: public transport, walking and cycling routes
  • Bicycle parking and end-of-trip facilities against Clause 52.34
  • Car share, electric vehicle charging and car parking management
  • Information and incentives for residents, staff and visitors
  • Targets, actions, the responsible person, and monitoring and review

When council asks for it

Most often with a Sustainability Management Plan: the local ESD policy (Clause 15.01-2L) in many council planning schemes asks for an SMP and a Green Travel Plan for 10 or more dwellings, and for larger non-residential buildings, with the floor area set by each council.

There is no single statewide trigger. Some planning scheme schedules list a Green Travel Plan as an application requirement, for example Merri-bek Design and Development Overlay Schedule 23 and Monash Development Plan Overlay Schedule 6.

Maribyrnong's local policy (Clause 18.01-1L) names residential developments of 60 to 200 dwellings and developments seeking significant car parking dispensations.

Councils also set it as a permit condition, to be approved before development starts or before plans are endorsed, as in Monash and Merri-bek permits.

Sources: Victoria Planning Provisions Clauses 52.34 and 52.06-7; council ESD local policies (Clause 15.01-2L); Maribyrnong Planning Scheme Clause 18.01-1L; Merri-bek Planning Scheme DDO Schedule 23; Monash Planning Scheme DPO Schedule 6 and permit conditions; Whitehorse and Wyndham council guidance.

Official references: Planning Victoria. .

Read more