Beyond Green Energy Assessments Beyond GreenEnergy Assessments

Planning permit · Council sustainability

SDA and ESD reports for the planning permit.

The sustainability assessment councils ask for at planning stage, prepared from your drawings and reported against the categories they score.

Planning stageInterstate work consideredFixed quote

What's covered

The sustainability commitments, documented.

ASSESSMENT

Sustainable Design Assessment

The report councils request with a planning application, covering energy, water, indoor environment quality and the rest of the scored categories.

ESD

ESD reports

Where the application is larger or the permit condition asks for more detail, the same ground covered at the depth required.

TOGETHER

Runs with the rest

Most planning permits want the sustainability and stormwater assessments together. Both are done here, off the same drawing set. Stormwater →

Council requirements vary. Send the permit conditions with the drawings and the scope is confirmed before quoting.

What gets scored

Councils score categories, not a single number.

A Sustainable Design Assessment is answered category by category, and each one is evidenced from the drawings rather than asserted. Stormwater is one of those categories, which is why the two reports are usually prepared off the same set.

Planning stage

Categories answered0
Reports usually issued together0
Victorian councils0

Category names and weightings vary between councils. Send the permit conditions with the drawings and the scope is confirmed before quoting.

Contact

Tell us about the project.

Tell us which report you need and send the drawings. A fixed quote comes straight back.

Email bgenergyassessments@gmail.com Call 0470 389 168

Taner Terlemez · Beyond Green Energy Assessments · ABN 25 918 681 385

Already have the drawings?

Send them straight through and skip a round of back-and-forth. Four questions, then the upload.

Send drawings for a quote

What does the project need?

Report type

The project

Where is it
NCC edition, if known

Compliance pathway

Which pathway does it need

You and the drawings