What NCC 2025 changed, and what it means for your drawings.

Victoria adopted NCC 2025 on 1 May 2026 with no transition period. Three changes reach the drawings on most commercial projects.

Site foreman reading plans at a new house

Three things that land on the drawings.

On-site solar

NCC 2025 updates J9D5 so Class 3 and Class 5–9 buildings install solar PV rather than only leaving space for it later. That lands on the roof plan, not just the report.

Tighter fabric and glazing

Section J4 is strengthened, with new thermal emittance rules for roofs and stricter solar admittance for wall-glazing (J4D6). Glazing specified to a 2022 report does not necessarily pass.

Not the same date everywhere

Victoria takes NCC 2025 from 1 May 2026, WA and the ACT from the same date with a 12-month transition; NSW, Queensland, SA and Tasmania from 1 May 2027; the NT has not adopted it. Which edition applies follows your permit date, not the calendar.

Not the same date everywhere.

The edition your project is assessed against follows the permit date and the state, not the calendar. A job permitted before adoption stays on the earlier edition — which is why three editions are still in use here at the same time.

Which edition applies depends on your permit date and the state the project is in — adoption runs from 1 May 2026 in Victoria, WA and the ACT (WA and the ACT with a 12-month transition), and 1 May 2027 in NSW, Queensland, SA and Tasmania.

Tell us the permit date and the state, and the edition is confirmed before any work starts.

Need a Section J report?

For builders, developers and architects with a Class 3 to 9 building: NCC 2025, 2022 or 2019, within 72 hours.

Which reports does my job need?

The usual list, from each council’s planning scheme and website.

1. What are you building?
3. What stage are you at?

Tell us about the project.

A quick quote from your plans, before any work starts.

Quick quote from your plans. Planning and residential reports within 48 hours; Section J, CMP and GTP within 72 hours.

Start here

See which reports your job needs, then get the quote for that list.

Call 0470 389 168

Request a quote

Your name, email and the report you need. Add the drawings now or later.

Your details

Report type
Add details (optional)
NCC edition, if known
Which pathway does it need
What will it cost?
A quick quote from your plans, before any work starts.
Will council accept it?
Every report is written to the council’s own policy or the NCC edition that applies.